Good to see you!
Otherwise login by email.
Welcome to Dulux
Otherwise login by email.
Terms & Conditions
Registration complete
Successfully registered, please login
Registration complete
Forgotten your password?
Please enter email address associated to your account
Change Password
Password changed successfully.
Request sent!
If you have concerns about your privacy?
Read our Privacy Policy.
Delete Account
VIVELATEX
-
Drying Time 1 Hour (as Primer)
-
Coats 1
-
Simple & Easy Surface Preparation
-
Increases the Toughness of Paint
Product Description
Application Description
Health & Safety
Tips & Advice
-
1. Preparing the SurfacesSurfaces must be clean, dry and free from all defective and poorly adhering materials, dirt, grease and salts. Moisten cementitious substrates to saturation. Treatments such as dry sanding will generate dust. Wet sanding should be used wherever possible. Work in well ventilated areas. Use appropriate means for respiratory protection.
-
2. StoringStore between 5oC to 40oC.
How much paint do I need?
Measure the height and length of the surface you want to paint (in metres or centimetres).
Your Measurements:
{{!-- This value will be injected with JavaScript --}}
Amount needed:
{{!-- This value will be injected with JavaScript --}}
This is an estimated based on 2 coats. Actual coverage will depend on the conditions of the surface. If the colour change is strong, more coats may be required.
Add a new job
Add a new job
Edit a job
Delete job
Are you sure? All notes, photos and saved items will be deleted.
Save colour
Save to My Workspace
Save product
VIVELATEX
Save job